PROJECT | CLIENT |
---|---|
"PROVISION OF SUPPLY, INSTALLATION & COMMISIONNING WIND TURBINE SYSTEM FOR BLA, CKB AND CKC WELLHEAD PLATFORM" | EXACT Automation Sdn.Bhd. |
SMDS RE-ENGINEERING DRAWINGS AND DOCUMENTATION | SOLUTAS |
1216A / SMDS / K-3021/41 DISCHARGE FLOW MEASUREMENT HOOK-UP/ISOMETRIC DRAWINGS IN NATIVE FORMAT (ENGINEERING DESIGN) | Control Care/TENAGA BUMISAR |
PROVISION OF DETAIL ENGINEERING FOR SAND MANAGEMENT SKID FOR ANGSI PLATFORM-PMA | Enerscope |
PROVISION OF STP188 MRCSB SULPHUR & COKE EXPORT SYSTEM AND STOCKPILER & STOCKPILING SYSTEM PROJECT-ENGINEERING | MRCSB |
E&I WORKS FOR PROVISION OF STP188 MRCSB SULPHUR & COKE EXPORT SYSTEM AND STOCKPILER & STOCKPILING SYSTEM PROJECT-CONSTRUCTION | MRCSB E&I Construction & Installation |
SECONDED MANPOWER FOR GRAPHITE PROJECT- PROJECT ENGINEER | Ingress Fabricators |
ENGINEERING, PROCUREMENT AND CONSTRUCTION (3EPCC2) OF TANK TRUCK LOADING RACK (3TTLR2) SULPHUR FACILITY UPGRADING AT PDB MELAKA FUEL TERMINAL - PDB/SDD/46/2019/2156 | Revmax Engineering Sdn Bhd |
PROVISION OF SAMARANG GAS ENGINE-COTP PUMP TO ELECTRICAL MOTOR WITH VFD | Haluan Cekap |
EPCC OF TTLR SULPHUR FACILITY UPGARADING AT PDB MELAKA FUEL TERMINAL - CONSTRUCTION | Revmax Engineering Sdn Bhd |
TO PERFORM PROCESS SIMULATION AND MODELLING STUDY FOR GDC (HYSYS) | GDC Putrajaya |
EPCC HENGYUAN REFINING COMPANY (HRC) METERING STATION PROJECT (HYREC) | AXIAENERGY |
PROJECT | CLIENT |
---|---|
PROVISION FOR SUPPLYING CONCRETE SLAB FOR NEW 02 CLEAN ROOM, PANTRY ACCESSORIES AND AWNING AT NEW RE WORKSHOP | LINDE HICOM NEW RE WORKSHOP |
RE-WORK ON PROVISION OF DETAIL ENGINEERING DESIGN (DED) FOR VOS PRODUCTION ENHANCEMENT PACKAGE | VOS |
ENGINEERING , PROCUREMENT, CONSTRUCTION & COMMISSIONING FOR SEWAGE SYSTEM REFURBISHMENT | PETRONAS CHEMICALS POLYETHYLENE SDN BHD |
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR PHOENIX PILOT PLANT AT TGAST | TGAST |
PROVISION OF DESIGN AND BUILD FOR FUME HOOD INSTALLATION COMPLETE WITH PIPING, TUBING AND ETC AT NEW O2 CLEAN ROOM (TCE TUBING INLET - 1/2'' AND OUTLET - 1'') | LINDE |
INSTRUMENT PACKAGE FOR RELOCATION OF DMDS INJECTION POINT AT HCFE PCMTBE (PDH) PROJECT | PETRONAS CHEMICALS MTBE SDN BHD (PDH) |
TO DESIGN, BUILD AND INSTALL NEW WATER PIPING AT O2 CLEAN ROOM | LINDE |
EPCC FOR OLEOPHILIC COALESCER FACILITIES INSTALLATION AT PPTSB | PETRONAS PENAPISAN (TERENGGANU) SDN BHD |
EPCC ASSISTANCE FOR FGRU SWEETENER PROJECT AT MRCSB | PETRONAS PENAPISAN (TERENGGANU) SDN BHD |
PROFESSIONAL ENGINEER ENDORSEMENT OF MECHANICAL CALCULATION AND 4 NOS OF DETAIL DRAWINGS FOR OLEOPHILIC COALESCER PROJECT FOR PPTSB | PETRONAS PENAPISAN (MELAKA) SDN BHD |
SUPPLY & DELIVERY OF HYDRAULIC POWER UNIT FOR ANGSI DELTA | PETRONAS PENAPISAN (TERENGGANU) SDN BHD |
SUPPLY & DELIVERY OF HYDRAULIC POWER UNIT FOR ANGSI ECHO | PETRONAS CARIGALI SDN BHD |
SUPPLY OF HPU COMMISSIONING ENGINEER - OFFSHORE | PETRONAS CARIGALI SDN BHD |
CONTRACT FOR SERVICES - WAN ZULKARNAIN WAN JAAFAR | MMC OIL & GAS ENGINEERING SDN BHD (KERTIH OFFICE) |
CONTRACT FOR SERVICES - NUR AMNANIE BINTI ZULKIFLI | MMC OIL & GAS ENGINEERING SDN BHD (KERTIH OFFICE) |
EPCC FOR THE SUPPLY OF CARBON DIOXIDE (CO2) PROJECT AT GAS PROCESSSING KERTIH (GPK), PGB | PETRONAS GAS BERHAD |
EPCC FOR PROPONE & BUTANE IMPORTATION FACILITIES PROJECT AT TANJUNG SULONG EXPORT TERMINAL (TSET), PETRONAS GAS BERHAD | PETRONAS GAS BERHAD |
ENGINEERING SERVICES TO PERFORM PIPE STRESS ANALYSIS ON PIPE SUPPORT DESIGN AT PDPP | PDPP |
DRAUGHTMAN SECONDED FOR PERIOD 01/11/2018 - 31/12/2018 | DWISOLAR |
EPCC FOR PROPANE & BUTANE IMPORTATION FACILITIES AT TSET, PGB | PETRONAS GAS BERHAD |
PROJECT | CLIENT |
---|---|
PREPARE HAZARDOUS AREA CLASSIFICATION | ONE CHEM TERMINALS SDN BHD |
EMEPMI GUNTONG A PLATFORM PGS UPGRADE PROJECT (INSTALLATION & MTO DRAWINGS) CMN | TRISYSTEM SDN BHD |
DED FOR OXYGEN ANALYZER IMPROVEMENT PROJECT AT PCOSB | ZSR VORTICES SDN BHD |
CONSULTANCY SERVICES, FRONT END ENGINEERING DESIGN AND PROJECT MANAGEMENT SYSTEM (PMS) UPGRADE PROJECT AT GAS DISTRICT COOLING PUTRAJAYA PLANT 1 FOR GAS DISTRICT COOLING (PUTRAJAYA) SDN BHD | GAS COOLING DISTRICT PUTRAJAYA |
PROVISION OF ENGINEERING CONSULTANCY SERVICES FOR RAPID WATER BEPCC PACKAGE - SECONDMENT OF ELECTRICAL ENGINEER AT WETSB, SHAH ALAM (IR.MUHAMMAD KHUZAIFAH HASSAN) | WETSB, SHAH ALAM |
PROVISION OF ENGINEERING CONSULTANCY SERVICES FOR RAPID WATER BEPCC PACKAGE - SECONDMENT OF ELECTRICAL ENGINEER AT WETSB, SHAH ALAM (IR.MUHAMMAD KHUZAIFAH HASSAN) | WETSB, SHAH ALAM |
INSTALLATION OF NEW FEED LINE FROM T29208 TO P29101S/B AT PP(T)SB | PETRONAS PENAPISAN (TERENGGANU) SDN BHD |
ENGINEERING WORK OF MECHANICAL STRENGTH CALCULATION AND DRAFTING OF INTERNAL DECANTER , BED SUPPORT AND ADDITIONAL NOZZLES OF ONE (1) UNIT COALESCER VESSEL FOR PETRONAS PENAPISAN (TERENGGANU) SDN BHD | PETRONAS PENAPISAN (TERENGGANU) SDN BHD |
ENGINEERING & DRAWING PACKAGE FOR ANGSI HPU & WIRELESS | PETRONAS CARIGALI SDN BHD |
PROVISION OF ENGINEERING CONSULTANCY SERVICES FOR RAPID WATER BEPCC PACKAGE - SECONDMENT OF ELECTRICAL ENGINEER AT WETSB, SHAH ALAM (IR.MUHAMMAD KHUZAIFAH HASSAN) | WETSB, SHAH ALAM |
HYDRAULIC POWER UNIT FOR FCV ANDP-C | PETRONAS CARIGALI SDN BHD |
PROVISION OF DESIGN AND BUILD FOR PARTITION OF NEW OFFICE, NEW WORKSHOP AND NEW 02 CLEAN ROOM | LINDE |
DRAUGHTMAN SECONDED FOR PERIOD 01/03/2018 - 30/10/2018 | LINDE |
PROJECT | CLIENT |
---|---|
TA CHRISTMAS TREES DOSH REGISTRATION | PETRONAS PENAPISAN (TERENGGANU) SDN BHD |
ELECTRICAL AND INSTRUMENTATION / TELECOMMUNICATION RE-ENGINEERING WORKS FOR PROJECT : PROVISION OF DESIGN & BUILD SERVICE FOR SABAH OIL & GAS TERMINAL (SOGT) ELEVATED ACCESS ROAD, PETRONAS CARIGALI | PCSB |
PROVISION OF SUPPLY MANPOWER FOR ENGINEERING, MECHANICAL DESIGN, ANALYSIS AND DRAFTING WORKS OF 5 UNITS TOWER FOR LOTTE CHEMICAL TITAN TE-3 PROJECT | PetChem |
PROVISION OF SUPPLY MANPOWER FOR ENGINEERING, MECHANICAL DESIGN, ANALYSIS AND DRAFTING WORKS OF 22 UNITS DRUMS AND VESSELS FOR LOTTE CHEMICAL TITAN TE-3 PROJECT | Lotte Plant |
PACKAGE 14-1702 - UTILITIES, INTERCONNECTING, OFFSITE (UIO) FACILITIES : EPCC OF SUBSTATIONS (275KV, 33KV & 11KV), FIELD AUXILIARY ROOMS, OPERATOR SHELTER BUILDING & LOCAL CONTROL BUILDING | PetChem |
ENGINEERING SERVICE COST P&ID & PMS DEVELOPMENT FOR FPSO BERTAM - P&ID DEVELOPMENT | PCSB |
ENGINEERING SERVICES FOR HULL STORAGE TANKS | PetCHem |
PROVISION OF SUPPLY MANPOWER FOR ENGINEERING DESIGN WORK OF 23 DESIGN OF HEAT EXCHANGERS FOR BIDDING RAPID PROJECT | RAPID Pengerang |
CONSULTANCY SERVICES FOR INTEGRATION OF KEMAMAN SUPPLY BASE AND RELATED WORKS, MUKIM TELUK KALONG, DAERAH KEMAMAN, TERENGGANU DARUL IMAN | KSB |
ADDITIONAL SCOPE FOR ENGINEERING AT RESAK & DUYONG | PCSB |
ENGINEERING SERVICES FOR HULL STORAGE TANKS | PetChem |
PCMTBE KIMAU PURUT PROJECT | PCMTBE |
ADDITIONAL SCOPE FOR ENGINEERING AT ANGSI PLATFORM | PCSB |
PROVISION OF EPIC OF FACILITIES FOR ORIGINS PROJECT, PETRONAS CARIGALI SDN BHD (PACKAGE 2 WEST LUTONG) | PETRONAS CARIGALI SDN BHD |
PROVISION OF EPIC OF FACILITIES FOR ORIGINS PROJECT, PETRONAS CARIGALI SDN BHD (PACKAGE 3 WEST LUTONG) | PETRONAS CARIGALI SDN BHD |
EE CONSULTANCY | DDP ECRO, KERTEH, TERENGGANU |